For all new systems, photos showing all modules within each array listed are required. The photo(s) must be clear enough to allow counting of each individual module. An Interconnection Approval Agreement, Certificate of Completion (CoC), or Permission to Operate (PTO) document is required for all systems. The Certificate of Completion (CoC) or the Permission to Operate (PTO) must confirm the date the utility granted final approval to operate the system.

If an application is submitted more than 30 days after utility interconnection approval is issued, a meter photo is required. This may be taken from a solar-dedicated meter showing the reading or from an online monitoring portal, if applicable. Photos from bi-directional meters are not allowed for verification purposes as they reflect both production and consumption of a system.

If you have selected an aggregator to manage your system, either a Recognition of Assignment (ROA) or a Schedule A is required. An ROA is required for leased/PPA systems while a Schedule A is required for non-leased/PPA aggregated systems. Please thoroughly review the document and ensure that all required signatures are present. 

If your system contains a battery, a site-specific electrical diagram showing the location of the battery is required.

For facilities > 250 kW DC, a site plan showing the layout of all installed modules is required. Please see Qualification for specific facility type requirements.